Sibor > Case Studies > Stanton Energy Biogas Case Study

Stanton Energy Biogas Case Study

We were approached by Stanton Energy Ltd in June 2020 to provide the electrical power installation for the site, from the LV transformer to the main site power users, namely the technology provider distribution board 1000A, Biogas upgrader system 1000A, GEU 63A and Site main power distribution 250A.

The main site infrastructure was also required using heavy duty ladder rack, 600 to 900mm width, dual level and over 200m.

The entire installation from the transformer to all of the site power user took 8 weeks and came within budget.

After receiving the order to complete the LV distribution, we were asked by the technology provider “Host Biogas” to tender for the main site LV and control cabling and infrastructure.  We were awarded the contract in the August 2020, completing in the January of 2021.

The client was delighted with the installation and further awarded the Lighting and CCTV installation.